Water Main Replacements - 2023 Package, CIP No. 8190

The work shall include abandonment of existing water main, installation of new water main and connection to existing water system, reconnecting water services and fire hydrant services, storm drain pipe and inlets, curb, gutter and sidewalk, curb ramps, and pavement restoration in accordance with the intent of the Project Plans and Specifications. All work shall be performed in accordance with the City of Davis Standard Specifications January 1996 Edition, Addenda through July 2017, General Prevailing Wage Rate, Labor Surcharge and Equipment Rental Rates, and the Contact Documents.

Status

Bidding Closed

Bid Date5/17/23 2:00pm

Company & Contacts

City of Davis

Terry Jue   tjue@cityofdavis.org

Location

Davis, CA

Engineer’s Estimate: $3,721,850