Public Jobs

Bids due in 9 days
1/25/21 2:00 pm
Pole Line Rd-Olive Dr Connection-Montgomery WBAR
City of Davis
Davis, CA
POLE LINE / OLIVE DRIVE CONNECTION CIP No. 8313 [Federal Project No. 5238(068)] : This work shall include construction of connection of Olive Drive Pedestrian Bicycke Trail to Pole Line Road Overcrossing Bridge at I-80 and UPRR railroad. The Connection will consist of a linear ramp bridge cast-in-place reinforced-concrete box-girder bridge approximately 14 ft. wide and 408 ft. long. With a longitudinal slope of 8 percent and for the proposed bridge six piles of supporting columns that reach depths between 60 and 80 feet and be approximately 8 by 6 feet square: including all labor, materials, equipment, and incidentals, to completely install an operating facility in accordance with the Project Plans and Specifications. The Project is funded partially by grant funds from a Federal Grant. Accordingly, all Federal Requirements set forth in the Contract Documents must be complied with. MONTGOMERY WBAR IMPROVEMENTS CIP No. 8313 [Federal Project No. 5238(068)] :
Bids due in 5 days
1/21/21 2:00 pm
2020 Pavement Rehab-Bike Path Package
City of Davis
Davis, CA
The work shall include bike path and lighting improvements in the Green Meadows neighborhood and along Donner Avenue within the City of Davis as follows but not limited to: removing and disposing of AC surfacing and base materials, removal and disposal of concrete improvements, curb, gutter, sidewalk, curb ramp, bike path repairs and replacements, removal and replacement of landscape features, aggregate base course, grading, underground electrical conduit and wiring, irrigation system replacement, electrical pull box installation, tree/root trimming, vegetation trimming, etc., including all labor, materials, equipment, and incidentals to completely install an operating facility in accordance with the intent of the Project Plans and Specifications. All work shall be performed in accordance with the City of Davis Standard Specifications January 1996 Edition, Addenda through July 2017, Davis-Bacon Wage Determinations, General Prevailing Wage Rate, Labor Surcharge and Equipment Rental Rates, and the Contact Documents.
Bidding Closed
10/20/20 2:00 pm
2020 Striping Project
City of Davis Public Works - Engineering & Transportation Department
Davis, CA
2020 STRIPING PROJECT: The Project consists of 1 design package; 2020 STRIPING PROJECT. In general the work included in the striping package includes mobilization, public notification, traffic control; and installing traffic striping, marking and markers.
Bidding Closed
10/29/20 2:00 pm
West Area Tank- Structural Upgrade
City of Davis Public Works - Engineering & Transportation Department
Davis, CA
West Area Tank – Structural Upgrade, Program No. 7522. The work includes sawcutting, installing reinforced concrete strengthening beams, pipe fitting and pipe support.
Bidding Closed
10/26/20 2:00 pm
Sewer Lift Station No. 4 Rehab
City of Davis
Davis, CA
Sewer Lift Station No. 4 Rehabilitation, CIP No. 8275: The Base Bid Work includes demolition of existing sewer lift station, construction of new lift station, installation and operation of a temporary sewer bypass system, installation of gravity sewer lines, forcemains by trenching and sliplining, maintenance holes, site paving, gate and fencing and functional testing of new lift station. The Bid Add Alternate Work includes base repairs and slurry seal of a bike path; base repairs, AC patching and slurry seal of street sections; curb, gutter and sidewalk repairs; and striping; conduit installation with forcemain sliplining.
Bidding Closed
8/27/20 10:00 am
Varsity Theatre Roof Replacement
City of Davis
Davis, CA
The scope of this project is to replace existing damaged single-ply PVC membrane roofing, and clean, patch and repair existing single-ply roof assemblies. The work also includes the replacement of flashings, scuppers, and drains. Neon theatre signage requires temporary relocation for re-roofing along with minor repair and reinstallation as an allowance item. Two existing rooftop exhaust fans require replacement as allowance item deferred submittals. The work includes but is not limited to demolition, general construction, sheet metal flashing and trim, weather barriers, and miscellaneous painting. With the exception of the work required for the two allowance items, all work indicated in the contract plans and specifications shall be enumerated within the Bid Form below. Additionally, there is asbestos-containing material on the roof in the form of roof mastic. This portion of the work shall be performed by a Class HAZ subcontractor.
Bidding Closed
6/24/20 2:00 pm
2020 Pavement Rehabilitation Project
City of Davis
Davis, CA
In general the work included in the slurry seal package includes mobilization, public notification, traffic control; hot-mix asphalt (HMA) patches and base repairs; concrete improvements, including curb ramp repalcements for ADA compliance, sidewalk and curb and gutter repairs; slurry seals and cape seals; and installing traffic striping, marking and markers.
Bidding Closed
6/11/20 2:00 pm
Russell Blvd./ UCD Bike Path Improvements
City of Davis Public Works - Engineering & Transportation Department
Davis, CA
This Project involes clearing, and grubbing to install a new bike path south of Russell Blvd. starting at Arthur Rd. Work will include excavation, demolition of existing asphalt concrete bike path connections, subgrade preparation, installation, and compaction of aggregate base, and asphalt concrete, as well as rotating, or relocating lightpoles.
Bidding Closed
5/19/20 2:00 pm
2020 Concrete Replacement Project
City of Davis
Davis, CA
The work includes paving and sidewalk improvements on various streets within Davis as follows: saw cutting, asphalt patching, curb, gutter, sidewalk, bike path repairs, placing of aggregate base, grading, and tree/root trimming, including all labor, materials, equipment, and incidentals, to completely install an operating facility in accordance with the and Specifications.
Bidding Closed
5/21/20 2:00 pm
66 Inch Influent Sewer Sliplining
City of Davis
Davis, CA
The work consists of cleaning the 66” Influent Sewer, sewer plugging and temporary bypass operations, TV-inspection of sewer line, excavation for insertion and winching pits, pipebursting and inserting 42-inch HDPE slipliner pipe, grouting annular space between host and slip liner, installing new maintenance holes, rehabilitating maintenance holes, abandoning maintenance holes, and construction of maintenance access road including all labor, materials, equipment and incidentals, to completely install an operating facility in accordance with the Project Plans and Specifications.