Pole Line Rd-Olive Dr Connection-Montgomery WBAR

POLE LINE / OLIVE DRIVE CONNECTION CIP No. 8313 [Federal Project No. 5238(068)] : This work shall include construction of connection of Olive Drive Pedestrian Bicycke Trail to Pole Line Road Overcrossing Bridge at I-80 and UPRR railroad. The Connection will consist of a linear ramp bridge cast-in-place reinforced-concrete box-girder bridge approximately 14 ft. wide and 408 ft. long. With a longitudinal slope of 8 percent and for the proposed bridge six piles of supporting columns that reach depths between 60 and 80 feet and be approximately 8 by 6 feet square: including all labor, materials, equipment, and incidentals, to completely install an operating facility in accordance with the Project Plans and Specifications. The Project is funded partially by grant funds from a Federal Grant. Accordingly, all Federal Requirements set forth in the Contract Documents must be complied with. MONTGOMERY WBAR IMPROVEMENTS CIP No. 8313 [Federal Project No. 5238(068)] :

Status

Bidding Closed

Bid Date1/25/21 2:00 pm

Company & Contacts

City of Davis

Michael Mitchell  

Location

Davis, CA

Documents

Engineer’s Estimate: $4,000,000.00